I need a solution
After testing several Oracle installation packages, once successful, I deleted the assigned pcs from the task/job.
However, the task/job is repeatedly sent to the pc again after I have removed (deleted) the task/job package(source files). I have deleted from a few pc and each time the package comes back to them. The content is sent, but not installed. How do I stop having the source files being resent?
0