I'm reach out to see how people are addressing this.
For example, I have a Client job called "Visual Studio 2012" but it is a list of tasks including the Quick Depoy task "Install Visual Studio 2012". The thing is, our technicians locate the jobs and are never sure which to run. I'd like to say "the icon that looks like a clipboard" so they only run the Client Job but not EVERY piece of software we deploy is nested inside a Client Job. I don't want to create a client job for everything either.
I've tried created a folder "ZZZ - Called Tasks - Do not run" in hopes that placing all my called tasks inside this folder, when you search they would appear at the bottom of the list and inside a folder labled "do not run". Hasn't helped :(
I don't want to rename the "install visual studio 2012" task to something like "install software #001" so it doesn't appear in searched.
In a perfect world, I would have a "hide from searches" toggle for the task.
Has anyone tried to address this in any creative ways I'm not thinking of?